Oregon separates three things that tenants often blend into one: the habitability standard, the remedy for a minor defect, and the remedy for a lost essential service. Each has its own statute and its own notice requirements.
A landlord must keep the unit habitable at all times. The statute lists what that means, including:
ORS 90.320 also requires the landlord to repair defects that arise during the tenancy, not just at move-in.
When a landlord fails to meet the habitability standard, ORS 90.360 gives the tenant options after written notice: recover damages based on the reduced rental value, obtain an order requiring repair, or terminate the tenancy in the manner the statute allows. It also lets a tenant defend a rent action by showing the unit was not habitable.
The written notice matters here as much as anywhere: it fixes the date the landlord knew, and the date from which the loss of value is measured.
This is Oregon's narrow repair-and-deduct route, and the limits are tight:
The remedy is unavailable if the landlord substantially repairs before the date in the notice, if you prevented the repair, if you or a guest caused the defect, if you knew about it for more than six months before giving notice, or if you already used the remedy for the same occurrence.
It also cannot be combined with the damages claim under ORS 90.360 for the same breach. Choose the route deliberately.
If the landlord fails to supply an essential service — water, heat, electricity, sewer — the tenant may, after written notice and a reasonable time:
If the failure poses an imminent and serious threat to health, safety, or property, the notice may terminate the tenancy in not less than 48 hours unless the breach is cured. That is a termination right, not permission to stop paying while staying.
Oregon's service rules are specific: ORS 90.155 governs delivery of written notices, and first-class mail adds three days to the notice period. That three-day addition is a common trap — a notice dated the 1st does not expire on the 8th if it was mailed.
Include: tenant and unit; landlord and the address designated for notices; each defect; the date it began; the statute you rely on; the remedy you will use if the deadline passes (hiring a contractor under § 90.368, or pursuing damages under § 90.360); and a specific date.
Informational only; not legal advice. Confirm current statutory text and local rules before acting.
A guide tells you the rule. A notice makes the landlord answer to it, with the date and the citation on the record.
Build a repair notice| Element | Rule |
|---|
| What counts | A defect reasonably repairable for no more than $300 |
| Excluded | Mold, radon, asbestos, lead-based paint |
| Notice | Written, describing the defect and stating intent to repair and deduct |
| Waiting period | At least 7 days after the notice |
| Who does the work | A contractor — not the tenant |
| Paperwork | A written statement from the person who did the work showing the actual cost |
| Deduction ceiling | Actual and reasonable cost, not to exceed $300 |